DiyLightAnimation
Hardware => Lynx EtherDongle => Lynx Conductor => Topic started by: peteandvanessa on October 02, 2013, 11:52:04 am
-
I ran my 1st Halloween show last night. I loaded six sequences into the scheduler (Using the Etherdongle/Condutor, and exported from LSP), set it to start at 7pm and to finish at 9pm. The show started up right on time and ran for two hours without a single glitch.
Sweet!
-
Giggity!
-
Nice
-
Sweet!!!!
-
Fantastic!!!!!!!!!!
animal
-
Very cool. Have yet to put mine to use/test. Hopefully this year!
-
It's been running reliably every night (not that I did expect it to), but it's make such a difference to last year.
Because I had issues with the LSP scheduler I had to babysit the lights every night to make sure there wasn't any light lag and hiccups.
This year I can just pop open a beer and watch the show <pop..
-
I need to stop by and see this in the next week or two